Control Techniques drives continuous casters at Corus

Control Techniques drives feature on the latest continuous slab caster at Corus steelworks in Port Talbot, South Wales, controlling critical operations at the head of the line. The total output of the plant, anticipated to be 4.7 million tonnes in 2006, is dependent on drives from Control Techniques.

Read the full Applied case study